{"id":8966,"date":"2026-10-27T07:55:23","date_gmt":"2026-10-27T07:55:23","guid":{"rendered":"https:\/\/duinsa.es\/?p=8966"},"modified":"2026-10-28T14:54:36","modified_gmt":"2026-10-28T14:54:36","slug":"the-new-industrial-fire-safety-regulations","status":"publish","type":"post","link":"https:\/\/duinsa.es\/en\/the-new-industrial-fire-safety-regulations\/","title":{"rendered":"The New Industrial Fire Safety Regulations"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p>\ud83d\udd25 Are you planning to expand or modify an industrial facility? There are fire safety regulations you need to take into account.<\/p>\n<p>Royal Decree 164\/2025, which approved the new Fire Safety Regulations for Industrial Facilities (RSCIEI), has been in effect since May 10, 2025.<\/p>\n<p>This update is particularly relevant for those planning new facilities, expansions, or certain modifications to existing facilities.<\/p>\n<p>What aspects should be analyzed in each project?<br \/>\n\u25aa\ufe0f Characterization of the facility: activity, layout, sectors, and intrinsic risk level.<br \/>\n\u25aa\ufe0f Fire protection: construction requirements and protection systems mandated based on the facility\u2019s characteristics.<br \/>\n\u25aa\ufe0f Evacuation and accessibility: escape routes, exits, and conditions for emergency services to respond.<br \/>\n\u25aa\ufe0f Existing facilities: verify the scope of the work and the applicable transitional provisions.<\/p>\n<p>Not all facilities or renovations are subject to the same requirements.<\/p>\n<p>Fire safety is not a decision that should be left until the end of the project.<\/p>\n<p>In industrial construction, anticipating these requirements allows for the integration of necessary solutions from the earliest planning stages.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; \ud83d\udd25 Are you planning to expand or modify an industrial facility? There are fire safety regulations you need to take into account. Royal Decree 164\/2025, which approved the new Fire Safety Regulations for Industrial Facilities (RSCIEI), has been in effect since May 10, 2025. This update is particularly relevant for those planning new facilities, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-8966","post","type-post","status-publish","format-standard","hentry","category-general-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/posts\/8966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/comments?post=8966"}],"version-history":[{"count":3,"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/posts\/8966\/revisions"}],"predecessor-version":[{"id":9012,"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/posts\/8966\/revisions\/9012"}],"wp:attachment":[{"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/media?parent=8966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/categories?post=8966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duinsa.es\/en\/wp-json\/wp\/v2\/tags?post=8966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}